Multi-Stage Simultaneous Lot-Sizing and Scheduling

Multi-Stage Simultaneous Lot-Sizing and Scheduling Planning of Flow Lines with Shifting Bottlenecks

Sale price  $49.49 Regular price $54.99
Skip to product information
Multi-Stage Simultaneous Lot-Sizing and Scheduling

Multi-Stage Simultaneous Lot-Sizing and Scheduling Planning of Flow Lines with Shifting Bottlenecks

Sale price  $49.49 Regular price $54.99

Reliable shipping

Flexible returns

Produktion und Logistik

Multi-Stage Simultaneous Lot-Sizing and Scheduling

Planning of Flow Lines with Shifting Bottlenecks

Florian Seeanner

Business & Economics / Operations Research

In the consumer packaged goods industry, usually a large number of final items are produced in a highly automated flow line production system. Florian Seeanner presents a mathematical model which is an improved version of the General Lot-Sizing and Scheduling Problem for Multiple production Stages (GLSPMS) to tackle the problem of shifting bottlenecks. Especially, a new meta-heuristic is developed which combines the principles of Variable Neighborhood Decomposition Search (VNDS) and Exchange. This VNDS+E heuristic is able to find very good solutions for the improved GLSPMS, including a real-world problem case. Finally, further model extensions, e.g., for scarce setup resources, are proposed.

Dr. Florian Seeanner wrote his dissertation under Prof. Dr. Herbert Meyr’s supervision at the Chair of Production and Supply Chain Management at the Technische .Universität Darmstadt


Publication Date: 29 May 2013
Publisher: Springer Fachmedien Wiesbaden
Imprint: Springer Gabler
ISBN-13: 9783658020880
Format: Paperback softback
Page Count: 182

You may also like