Multi-Stage Simultaneous Lot-Sizing and Scheduling Planning of Flow Lines with Shifting Bottlenecks
Reliable shipping
Flexible returns
Produktion und Logistik
Multi-Stage Simultaneous Lot-Sizing and Scheduling
Planning of Flow Lines with Shifting Bottlenecks
Florian Seeanner
In the consumer packaged goods industry, usually a large number of final items are produced in a highly automated flow line production system. Florian Seeanner presents a mathematical model which is an improved version of the General Lot-Sizing and Scheduling Problem for Multiple production Stages (GLSPMS) to tackle the problem of shifting bottlenecks. Especially, a new meta-heuristic is developed which combines the principles of Variable Neighborhood Decomposition Search (VNDS) and Exchange. This VNDS+E heuristic is able to find very good solutions for the improved GLSPMS, including a real-world problem case. Finally, further model extensions, e.g., for scarce setup resources, are proposed.
Dr. Florian Seeanner wrote his dissertation under Prof. Dr. Herbert Meyr’s supervision at the Chair of Production and Supply Chain Management at the Technische .Universität Darmstadt
| Publication Date: | 29 May 2013 |
| Publisher: | Springer Fachmedien Wiesbaden |
| Imprint: | Springer Gabler |
| ISBN-13: | 9783658020880 |
| Format: | Paperback softback |
| Page Count: | 182 |